Video: Staying on track at 2 AM

Night work on the rail network accelerates rail traffic.

Train arriving on platform
30.01.2017 | Articolo

Temperatures just over freezing, rain by the bucketful. Deutsche Bahn uses each night for the maintenance of its rail network. A camera team from Porsche Consulting recorded them in action: on the West Rhine Railway between Koblenz and Bonn, the moving parts of a switch – the tongue rails in this case – were replaced in record time. Together with the management consultancy Porsche Consulting, Deutsche Bahn redesigned the procedures of its track construction team. The measurable result: shorter track closures and freed-up capacities for work on other parts of the rail system. Strategic vision, smart implementation. Porsche Consulting.

Insight

Tendenze & Soluzioni

Il gap di efficienza

Perché i lavori colletti bianchi sono in ritardo

Edilizia industrializzata

Miliardi di potenziali non sfruttati

"Il rivestimento di zucchero non lo taglierà"

Leader del settore Dirk Pfitzer sulla comunicazione di crisi nel l'ingegneria meccanica

Filtro

Settori

Practice