Video: Staying on track at 2 AM

Night work on the rail network accelerates rail traffic.

Train arriving on platform
30.01.2017 | Article

Temperatures just over freezing, rain by the bucketful. Deutsche Bahn uses each night for the maintenance of its rail network. A camera team from Porsche Consulting recorded them in action: on the West Rhine Railway between Koblenz and Bonn, the moving parts of a switch – the tongue rails in this case – were replaced in record time. Together with the management consultancy Porsche Consulting, Deutsche Bahn redesigned the procedures of its track construction team. The measurable result: shorter track closures and freed-up capacities for work on other parts of the rail system. Strategic vision, smart implementation. Porsche Consulting.

Insights

Trends & Solutions

A Pharmaceutical Company Puts Transfer First

Boehringer Ingelheim aims to build crisis-resilient production across its global manufacturing network

It Starts at the Top

In a crisis, top management looks to Human Resources. "Now HR needs to rethink its role," says expert Nicole Beger.

Strong Signals for the Railways

How the rail industry and operators want to strengthen rail transport together

Filter

Industries

Practices