Video: Staying on track at 2 AM

Night work on the rail network accelerates rail traffic.

30.01.2017 | Article

Temperatures just over freezing, rain by the bucketful. Deutsche Bahn uses each night for the maintenance of its rail network. A camera team from Porsche Consulting recorded them in action: on the West Rhine Railway between Koblenz and Bonn, the moving parts of a switch – the tongue rails in this case – were replaced in record time. Together with the management consultancy Porsche Consulting, Deutsche Bahn redesigned the procedures of its track construction team. The measurable result: shorter track closures and freed-up capacities for work on other parts of the rail system. Strategic vision, smart implementation. Porsche Consulting.

Insights

Trends & Solutions

Unique Opportunity for Europe’s Mechanical Engineering Industry

Study by Porsche Consulting in cooperation with VDMA on battery factories

Shaping the Future of Industrialized Design & Construction

Insights from the “Porsche Consulting Industrialized Design & Construction Day” 2024 in Stuttgart

Change in the Management of Porsche Consulting

Federico Magno joins the management of MHP

Filter

Industries

Practices